
Driveway crossovers in Wonthaggi and Bass Coast
Council-standard vehicle crossings for Wonthaggi, Inverloch, Phillip Island and nearby towns, including the Bass Coast Shire permit, service locating and inspection booking.
Email: info@wonthaggiconcreting.com.au
What a crossover is
Council calls it a vehicle crossing: the strip of concrete linking your boundary to the bitumen over the grass verge, the footpath if there is one, and the kerb. Because it sits on council land, it must be built to council's specification and needs a permit before work starts.
Bass Coast Shire permits
Bass Coast Shire Council issues vehicle-crossing permits across Wonthaggi and the whole shire. The permit sets the location, width and construction standard and requires inspection. We prepare the application, then build to the approved design.
Kerbs, footpaths and roadside drains
On kerbed town streets the work normally covers a laid-back kerb section and footpath reinstatement. On rural and coastal roads without kerbs, they often need a culvert pipe under the entrance so water in the roadside drain can keep flowing. Accesses onto the Bass Highway or other main roads also involve the state road authority.
Services and trees
Verges in Bass Coast towns carry water mains, power, gas, NBN and stormwater, so every line is located and marked before excavation. Street trees and poles can affect where a crossover may go.
Crossovers in the new estates
New estates around Wonthaggi often have crossovers specified as part of the subdivision, with set locations and widths. Some estates install crossovers during subdivision; others leave them for owners. We check what applies, apply for the permit and build to the standard drawing.
Farm gateways and culvert pipes
Where a country road has an open drain beside it, the entrance generally sits over a council-sized culvert so the roadside drain keeps flowing, with endwalls or headwalls to stop the pipe being damaged. The entry surface itself might be concrete, bitumen or rolled rock, as required by council requirements and the road.
Replacing an old crossover
Old crossovers crack and break, particularly where heavy trucks have used them. Replacing one requires a permit, removing the old concrete, reforming the kerb if needed and pouring to the current standard. We often replace crossovers at the same time as a new driveway.
Widening a crossover
Adding a second car space or a caravan pad sometimes means widening the crossover. Council sets maximum widths and minimum distances from trees, poles, pits and intersections. We check these before quoting.
Inspections
Council may inspect formwork before the pour and the finished crossover afterward. We coordinate inspections and keep you informed.
Making good
After the crossover is poured, the nature strip is reinstated and any footpath sections replaced to council's satisfaction.
Timing the permit
Permit processing can take some time, so we lodge applications early and schedule the crossover pour once approval is issued, ideally on the same day as the driveway.
Crossovers for holiday homes
Owners who are away can leave the permit and inspections with us; we send photos at each stage.
Bass Coast ground, weather and council rules
Wonthaggi sits where the coastal dunes of the Bunurong coast meet the clay country rising toward the Strzelecki foothills. Near the beaches at Cape Paterson, Inverloch and Kilcunda the ground is often pale sand that drains fast but moves if it is not confined and compacted. Inland, around North Wonthaggi, Dalyston and the farms, heavy clay swells in a wet winter and cracks open in a dry February. Parts of the old coal-mining town also carry fill, ash and brick rubble from a century of building. Add salt spray, sea mist and strong south-westerly winds, and concrete here needs a properly designed base, the right mix and careful curing. Each job gets a test hole, and the base is designed around the layers it shows.
Driveways, paths and patios within your own boundary usually need no permit. Any new or altered crossover across the nature strip, footpath or kerb needs a vehicle-crossing permit from Bass Coast Shire Council, which covers Wonthaggi, Inverloch, Phillip Island, San Remo and every town we work in. Accesses onto the Bass Highway or other main roads also involve the state road authority. House slabs, larger sheds and some coastal works need a building surveyor and engineering. We spell out whatever applies in your quote.
What a Wonthaggi Concreting quote shows
Our quotes are broken into the parts of the job rather than a single total. You will see the measured area, demolition and tip fees for any old concrete, pavers or gravel, how deep we excavate, the rock base specification and compaction method, slab thickness and reinforcement, the surface finish or pebble blend, the joint plan, drains and stormwater connections, edges and steps, sealing, and the council vehicle-crossing permit where one is needed. If a concrete pump, a long wheelbarrow run, traffic control on the Bass Highway or protection for a neighbour's driveway is required, it is listed on its own line.
This site deliberately carries no square-metre pricing. On the Bass Coast the same size driveway can sit on clean dune sand in Cape Paterson, wet grey clay in North Wonthaggi or old mine fill in South Dudley, and each needs different groundwork. A price published online would be wrong for most readers, so we prefer to look at your block and quote what it actually needs.
Crossovers and related jobs on the Bass Coast
Driveways, house and shed slabs, patios, crossovers and sealing for town homes, beach houses and farms across the Bass Coast.








Pictures show the types of finishes and projects we handle around Wonthaggi and the Bass Coast.
Why Bass Coast owners call Wonthaggi Concreting
Local to Wonthaggi 3995
From Wonthaggi we reach Inverloch, Cape Paterson, Phillip Island and Grantville without long travel days.
Sand and clay both handled
Coastal dune sand and inland reactive clay need different bases. We test and build for yours.
Free itemised quotes
No online rates and no phone guesses. A visit, then a written breakdown you can compare.
Built for the coast
Mixes, sealers, joints and curing chosen for salt spray, sea mist and strong winds.
How a Wonthaggi job runs, step by step
- 1
Get in touch
Phone, email or the online form, giving your town and the job in a sentence or two; a few photos of the area and street entry help a lot.
- 2
Site visit
Measurements, levels and a test hole, plus a check of runoff, wind exposure and truck access, with finish samples on hand.
- 3
Written quote
An itemised quote by email covering groundwork, base, slab, steel, finish, joints, drainage and any council permit.
- 4
Preparation
Old surfaces removed, soft clay or loose sand dug out, rock laid and compacted in layers, formwork and reinforcement set.
- 5
Pour day
Concrete placed from the truck or a pump, screeded, finished to the surface you chose and protected from wind and sun.
- 6
Handover
Joints saw-cut, forms stripped, the site cleaned, sealer applied if included, and written care advice left with you.
Crossovers around Wonthaggi and the Bass Coast

Inverloch 3996
Inverloch sits on Anderson Inlet east of Wonthaggi, mixing permanent homes, holiday houses and new estates. We pour driveways, exposed aggregate, patios, slabs and crossovers from the surf beach to the inlet.
Concreting in Inverloch
Cape Paterson 3995
Cape Paterson is the small surf town on the Bunurong coast south of Wonthaggi. We pour driveways, paths, patios and slabs for beach houses and new homes on its sandy blocks.
Concreting in Cape Paterson
North Wonthaggi 3995
North Wonthaggi takes in established streets and newer estates on the town's northern side. We pour driveways, crossovers, patios, house slabs and shed slabs across the area.
Concreting in North Wonthaggi
South Dudley 3995
South Dudley is the older residential area on Wonthaggi's south side, close to the State Coal Mine heritage site. We replace driveways and pour patios, paths and slabs on its established blocks.
Concreting in South Dudley
Kilcunda 3995
Kilcunda is the clifftop township on the Bass Highway between Wonthaggi and San Remo. We pour driveways, patios and slabs for homes facing the full weather of Bass Strait.
Concreting in Kilcunda
Dalyston 3992
Dalyston is the farming township on the Bass Highway north-west of Wonthaggi. We pour shed slabs, farm hardstands, driveways and house slabs for rural properties and town homes.
Concreting in Dalyston
San Remo 3925
San Remo is the fishing village at the Phillip Island bridge. We pour driveways, patios, paths and slabs on its sloping coastal blocks.
Concreting in San Remo
Phillip Island 3922
Phillip Island takes in Cowes, Rhyll, Ventnor, Newhaven, Surf Beach and Smiths Beach. We pour driveways, patios, slabs and crossovers for island homes and holiday houses.
Concreting in Phillip Island
Grantville 3984
Grantville sits on Western Port north of the Bass Coast towns, with lifestyle blocks and rural properties. We pour driveways, shed slabs and house slabs across the area.
Concreting in Grantville
Coronet Bay 3984
Coronet Bay is a quiet Western Port township near Corinella. We pour driveways, patios, paths and slabs for permanent and holiday homes.
Concreting in Coronet BayVehicle Crossovers questions
Is a council permit required for a crossing?
Every time. Bass Coast Shire issues it before work starts.
Can a crossover be widened?
Often, with council approval.
Who applies for the permit?
We prepare and lodge the application on your behalf and coordinate inspections.
What if there is a street tree near my crossover?
Council sets clearances from trees. If it is too close, the crossover may need to move or narrow.
Do rural entrances need a culvert?
Usually, where there is an open roadside drain. Council sets the pipe size.
Areas covered
Other services
Talk to a Wonthaggi concreter
Site visits and itemised written quotes are free from Wonthaggi to Inverloch, Phillip Island and Grantville. There are no rates online because coastal sand, inland clay and access change from block to block.